
F: RE / CE in-house
A: emissions & immunity testing before outside labs

F: 30,000 /mo · ≥99.8% first-pass yield
A: standard & custom builds at volume

F: 700 thermal-shock cycles · 1,000 h THB / HTOL
A: HALT / HASS screening, environmental testing
PROCESSSix steps, no surprises
Requirements
Input, output, wattage, environment — in writing
Design review
The build is checked against the lab’s test plan
Simulation
Electrical and thermal behaviour modelled first
Validation
HALT / HASS screening before any pilot run
Pilot run
Small batch, full test record
Mass production
30,000 units a month of line capacity
NUMBERSThe lab, in figures
| Measure | Figure |
|---|---|
| Thermal shock | 700 cycles |
| THB / HTOL | 1,000 h on record |
| EMC testing | RE / CE in-house chamber; surge & EFT on the bench |
| Monthly capacity | 30,000 units |
| First-pass yield | ≥99.8% |
| Field returns | ≤200 PPM |
Spare parts support continues after delivery, for the models we ship.
